Vol. 3, No. 2, 2017
Contents
- Cover Page
- Inside Cover Page
- Editorial Board
- Foreword and Editorial
- Table of Contents
- Copyright
- Augmented Reality System for the Pipeline Construction
Volume 3, No. 2, 2017, 8 pages,
DOI: http://dx.doi.org/10.21742/ijcmdi.2017.3.2.01
Authors: Seok-Han Lee
- Construction Robot Technology for Construction in Outer Walls of High-rise Building
Volume 3, No. 2, 2017, 6 pages,
DOI: http://dx.doi.org/10.21742/ijcmdi.2017.3.2.02
Authors: Dae-Geon Kim and Dong-geun Seo
- IT Convergence Technology-based BIM Connected Construction System Development
Volume 3, No. 2, 2017, 6 pages,
DOI: http://dx.doi.org/10.21742/ijcmdi.2017.3.2.03
Authors: Dae-Geon Kim and Dong-geun Seo
- Quality Assurance of CFT Column Upper Connection using Paper-drain
Volume 3, No. 2, 2017, 6 pages,
DOI: http://dx.doi.org/10.21742/ijcmdi.2017.3.2.04
Authors: Dong Oun Lee